Next:
1 Introduction
Up:
HP 5890/5970 GC/MS Operator's
Previous:
HP 5890/5970 GC/MS Operator's
Contents
1 Introduction
2 Cold Start: Starting from an 'Instrument Off' Condition
2.1 GC Preparations
2.2 MS Preparations
3 Warm Start: Starting from an 'Instrument Stand-by' Condition
3.1 GC
3.2 MS
4 Putting the GC/MS In 'Stand-By' Mode
5 Baking/Conditioning the Column
5.1 Baking
5.2 Conditioning
6 Determining an Appropriate Solvent Delay
7 Vacuum Leak Detection and Repair
7.1 Rough Vacuum Leaks
7.2 High Vacuum Leaks
John S. Riley,
DSB Scientific Consulting