next up previous contents
Next: 2.2 MS Preparations Up: 2 Cold Start: Starting Previous: 2 Cold Start: Starting   Contents

2.1 GC Preparations

  1. Turn on carrier gas to GC.
  2. Turn on GC and insure that flows are appropriate for column size. (A capillary direct column into the MS should have only 1-2 mL/min.)
  3. Continue with Section 3 Warm Start: Starting from an Instrument Stand-by Condition/GC.



John S. Riley, DSB Scientific Consulting